Stabilized armed earth in San Marino

The project

Stabilized reinforced earth wall

Construction of reinforced soil with GREEN STAB PAVE® with on-site soil reuse, stabilized on site with eco-friendly liquid product: fast processing, dust-free, high static and environmental performance.

In the project carried out in San Marino, 540 m³ of soil was treated to build a retaining structure about 3 meters high and 6 meters deep, articulated in 5 successive layers. The soil was of very poor quality, but it was successfully recovered thanks to our liquid stabilization system.
The laying stages:

  1. Placement of the formwork, geogrid and bio-mat
  2. laying of 35 cm of soil
  3. aspersione di GREEN STAB PAVE® diluito in acqua
  4. soil mixing
  5. compaction with ram roller

The result: a stable, green, high-performance work that is perfectly integrated into the landscape.

Green Ways® pavements

Products used in this case study:

Green Stab Pave®

Eco-friendly liquid stabilizer specifically designed for soils with poor geotechnical properties, enhancing load-bearing capacity and durability of treated surfaces.

Scopri il prodotto

Do you have a project in mind?
Fill out the form below and discover how Green Ways® solutions can make a difference!